Tosyali Algeria announced the commissioning of the second direct reduction unit, which operates using 100% natural gas or hydrogen with modification, which reduces carbon emissions.
The new module will produce 2.5 million tons of products (HDRI, CDRI) per year. According to equipment supplier Midrex, the plant is capable of operating with an increased percentage of hydrogen in the future.
which will then produce flat products. Tosyali Algeria plans to commission a new hot strip mill this year, and a cold strip mill and galvanizing line in 2025.
The company currently has two DRI plants with a capacity of 2.5 million tons per year each. It is also in talks with Midrex for a third plant, which will also be located in Bethia and will use the MIDREX Flex concept to convert to hydrogen.